Iron Horse with Jeanette and Gary

Iron Horse with Jeanette and Gary
Our 1st Co-Motion Speedster Tandem. This tandem was bent down the middle during a crash with a delivery truck, June 2008. We replaced with the same model tandem but changed the color to pewter grey. Our Italian jerseys were cut off our bodies at the hospital. We need to go to Italy to get new ones???

Who are we???

There are many who thought that the Deters Tandem Team started with the purchase of our first tandem bicycle in 2003, that is a good assumption but if one looks at the legendary WALL in our family room you will find the correct answer.

It all started in 1972 when two people fell in love. Jeanette and I have tried to make it as a team supporting each other in all our endeavors. Heading a family of 6 children, their spouses and 10 grandchildren in addition to schooling, work, church and other activities has not been an easy task. But together we have brought different skills and traits into the marriage that have complemented each other, working for the same goals as a team. It has not been as easy as it may sound but it has certainly been rewarding.

We both have a love for cycling and in 2003 found that by combining our efforts as a team we were stronger than being individual cyclists (we have found this principle to be true in so many areas of our lives together). It is not uncommon for us to be riding on level ground and to find that we are going well over 20 mph. As most tandem cyclists will tell you, they still go slow up the hills. Gravity pulls down heavy with two riders but we are even tackling that as a team usually working out together.

In 2006, we participated in the Seattle-to-Portland (STP) ride which consists of mainly flat terrain of 206 miles. The ride pulls in almost 10,000 riders from all over the country. About 80% of the participants do the ride in 2 days, but Jeanette and I with the other 20% completed the ride in 1 long day. Often during the day we found themselves at the front of a paceline pulling more fit half-bike (single) cyclists behind us.

You will notice in the picture of the tandem bike, that on the frame cross-bars, just in front of each saddle, are couplers. This allows the bike frame to come apart into 3 separate pieces so that the entire bike will fit with frame, wheels, saddles, etc into 2 standard size suitcases. THIS BIKE WAS BUILT FOR TRAVEL, but up until now the bike is feeling underutilized. It has so far traveled the roads of Washington, Oregon, Wyoming, Colorado and Texas. It longs to ride the pavement of other states, even try some foreign soil AND NOW IT WILL!!

NEW ZEALAND here we come. From 12/26/2009 through 1/10/2010, Jeanette and I will take our iron (Cro-Moly steel) horse to ride the roads on the south island of New Zealand! Follow us as we record our adventure in words and pictures. Hopefully each night we will be able to add to this blog some of our thoughts (only the good ones) and pictures from the day. As you can read from the itinerary of the trip, we will cycle for 9 days and cover 590 miles with several rest days. We will have some demanding rides with an average of 65 miles/day. This does not bother us until we look at the 2nd week where we have 3 straight days of demanding riding of 46, 92 and 88 miles. This has us somewhat concerned.

Our complete itinerary for the trip is listed at the bottom of the blog.

Wednesday, December 30, 2009






Wednesday 12/30
Today’s ride was gorgeous and took us right into the heart of the Southern Alps with great views and scenery everywhere. We left Lake Tekapo at 8:45 after a wonderful breakfast. Two kilometers into the ride we were supposed to connect with the scenic canal road but did not see the sign and missed the turn-off. This turned out to be all right because several that did turn off, found that the road had been closed due to high winds and had to get back on the highway. Further down the road we were able to catch a tail wind for about 2 miles. We also saw along this stretch where they were moving sheep across the road. New Zealand has built a magnificent series of canals that connect several of the lakes and generate the bulk of electrify that is used in the country. We followed the canal from Lake Tekapo to Lake Pukaki which are two glacier fed lakes. The color of these two lakes is a milky turquoise but very beautiful. Although the first half of our ride was very level along the canal we had a stiff head wind with the exception noted above. The wind yesterday was stronger and would have sent large sailing ships to the harbor for safety, todays wind would only require the tying down of small pets and children. IT WAS ANOTHER GRUELING RIDE. By the half way point we were praying for miracles because we did not think that we could make the next 30 miles. Our prayers were answered, when we turn off the highway to the road to Mt Cook, we encountered a tail wind almost all the way up to the town. Although the first half of today’s ride was exhausting and we were the last riders to arrive at the hotel (3 couples took advantage of the SAG vehicle and got a ride), we felt better than yesterday. Jeanette still was falling asleep at dinner.

Mt Cook is a spectacular place. It is the largest peak in New Zealand about 12,000 ft and rises straight up from where we were staying. Several glaciers are in the area. We also saw a Kea, which is a large mountain parrot, which is green with orange breast and a long beak. They are very smart but are a very big nuisance and can be very destructive eating rubber molding of cars and bikes. The bird was beautiful.

Our lodgings and the food (mostly buffets) have been terrific. I don’t think we could ask for better support from our guides, Darin and Al. They are New Zealanders, both have worked as nurses great cyclists and just fun to be with. I am starting to even understand them and their accent.

1 comments:

Melinda Macdonald said...

What stories you have to tell. It is awesome to hear about an amazing place, the culture, the ecosystem so different. You guys are great story tellers. Thank you so much for your daily updates. It is awesome to read. The last few days have been tough but today we are caught up on the adventure. We love you and Happy New Year! What an amazing way to bring in the new year! LOVE YOU

Post a Comment

Where is New Zealand???

Where is New Zealand???

New Zealand - South Island

New Zealand - South Island

Tour Itinerary

(see detail maps below)

Day 0. Saturday 26th December 2009
Depart Denver - cross international date-line losing a day

Day 1. Monday 28th December 2009
Arrive Christchurch for transfer to your accommodation in Geraldine (180 km/ 114miles).

Day 2. Tuesday 29th December 2009
Geraldine to Tekapo (90km/ 55miles)
A demanding days cycling with two climbs of 300-400m[1000-1300ft] over the day and an altitude gain of 600m[2000ft] over the day.

Day 3. Wednesday 30th December 2009
Tekapo- Mount Cook (100km/ 61miles)
A steady days cycling with several short climbs over the day, but no significant gain in altitude.

Day 4. Thursday 31st December 2009
Mount Cook to Omarama [90km/ 55miles].
A reasonably gentle day’s cycle, heading along the canals and glacier fed Southern Lakes of the McKenzie Basin. Your route takes you over several smaller hills of 100-200m over the day, but it’s an overall gradual descent to you destination of Omarama.

Day 5. Friday 1st January 2010
Omarama to Cromwell (110km/ 67miles).
A demanding days cycling that starts with a gradual climb and then steep climb, as you head tover the Lindis Pass [990m/3250ft]. From Lindis Pass it’s a sharp descent and then a flat ride to the Cluden Hill before your final 200m/650ft climb prior to Tarras. From Tarras a flat ride to Cromwell.

Day 6. Saturday 2nd January 2010
Cromwell to Queenstown (75km/46miles).
Today’s cycle is a steady 75km to Queenstown, with a number of hill climbs of 50-100m over the day and an altitude gain of 100m between Cromwell & Queenstown. This route is very scenic as you cycle alongside the through spectacular Kawarau River and the historic goldmining town of Arrowtown; in addition there are a number of suggested stops along the way, including wineries, jet boating and bungy jumping.

Day 7. Sunday 3rd January 2010
Rest Day Queenstown
10 am church at Queenstown Branch - 1076 Frankton Road

Day 8. Monday 4th January 2010
Queenstown to Wanaka (75km/46miles).
A relatively short distance, but a demanding day’s cycling that starts with an increasingly steep climb as you head over the crown range [1080m/3600ft]. From the crown range it’s a long descent and then a flat ride to Wanaka.

Day 9. Tuesday 5th January 2010
Wanaka to Haast (150km/ 92miles).
A demanding days cycling that starts with a fairly gentle series of flat road and smaller climbs before a steep climb over the demanding Haast Pass. Once over the Haast Pass it’s a great descent [with one small further climb] before a flat ride to Haast township.

Day 10. Wednesday 6th January 2010
Haast to Franz Josef (145km/ 88miles)
A demanding days cycling in terms of distance and difficulty with a number of sharp climbs including a steep ascent on your way to Franz Josef Glacier township.

Day 11. Thursday 7th January 2010
Rest Day Franz Josef

Day 12. Friday 8th January 2010
Franz Josef to Hokitka (130km/ 80miles)
A longish day in terms of distance, which starts with an undulating ride along the coast that doesn’t involve any significant climbs, before a flat ride to finish.

Day 13. Saturday 9th January 2010
Hokitika to Christchurch (140km/ 86miles)
Shuttle

Day 14. Sunday 10th January 2010
Complete Tour/ Depart Christchurch return to Denver. Leave at noon and get home before 3 pm because of gaining a day crossing international date-line.